Participated in a make-ready project for new construction which included re-routing electrical duct banks, re-routing storm drains and installing new drainage pools to handle the storm water volumes that will occur from the new construction.

GBI then contributed to the construction of the New Emergency Department building with the foundation footings, foundation walls and interior concrete slabs, improved drainage pools, concrete incased electrical duct banks, waterproofing, new town water connection, excavation and shoring, and underground fuel storage tank with new back-up generator.